A humanoid roadmap built on demonstrated progress.

The physical head is assembled and moving with face following. Local voice and vision, visual watches, spoken counters and public-web lookup now have a shared working-demo checkpoint. Alongside that build, governed-memory testing has reached 98 simulated days and 2,200 staged interactions. The next chapter builds on both: richer everyday interaction, longer continuity and a more capable physical presence.

Current chapter: physical head in motion · local interaction · 98 simulated memory days
  1. A
    PassedGoverned baseline

    MS-00 established the controlled Thor programme, source authority, 102 effective requirements, 16 milestones, 30 tracked risks, and explicit evidence labels.

  2. B
    Conditional platform · peripherals passedThor bring-up

    The 128 GB-class Thor kit is operational. MS-01 and MS-02 carry an explicit pristine-state deviation and an open recovery gate; MS-03 passed for standalone XVF/Pebble AEC and C920 fixtures.

  3. C
    MS-06 passed · local interaction demonstratedLocal intelligence + Core

    The Thor-generation identity was created with disclosed lineage. Local English and Spanish speech, camera interaction and owner-controlled memory have recorded development milestones.

  4. D
    5 November working demo savedVoice, vision + physical presence

    A moving physical head follows faces. Visual watches, spoken keyword counters, bilingual interaction and public-web lookup come together in the new demo. Recorded performance snapshots accompany the English and Spanish videos.

  5. E
    98 simulated days · 2,200 staged interactionsGoverned memory + Alpha

    Memory testing spans 14 simulated weeks of changing facts, preferences, corrections, deletion and restarts. The latest weekly block passed all 129 complete-answer reviews and corresponding state checks.

A moving head. A memory milestone. A new chapter.

J-019 brings together the 5 November physical demo, English and Spanish videos, measured response timing, visual watches and counters. It also celebrates the separate 98-day governed-memory milestone and the Seeed Studio hardware helping make the build real.

Read J-019

Five phases. Different proof burdens.

There is no percentage-complete score. Each stage advances when the relevant evidence exists.

  1. A
    Passed

    Governed baseline

    MS-00 established the controlled Thor programme, source authority, 102 effective requirements, 16 milestones, 30 tracked risks, and explicit evidence labels.

    Exit gate

    Keep the controlled baseline and traceability coherent

    AttentionMaintained
  2. B
    Conditional platform · peripherals passed

    Thor bring-up

    The 128 GB-class Thor kit is operational. MS-01 and MS-02 carry an explicit pristine-state deviation and an open recovery gate; MS-03 passed for standalone XVF/Pebble AEC and C920 fixtures.

    Exit gate

    Close recovery evidence without overstating the conditional passes

    AttentionOperational
  3. C
    MS-06 passed · local interaction demonstrated

    Local intelligence + Core

    The Thor-generation identity was created with disclosed lineage. Local English and Spanish speech, camera interaction and owner-controlled memory have recorded development milestones.

    Exit gate

    Preserve identity, privacy and owner control as capabilities grow

    AttentionLocal interaction
  4. D
    5 November working demo saved

    Voice, vision + physical presence

    A moving physical head follows faces. Visual watches, spoken keyword counters, bilingual interaction and public-web lookup come together in the new demo. Recorded performance snapshots accompany the English and Spanish videos.

    Exit gate

    Extend the measured interaction, timing, lifecycle and attended-motion evidence

    AttentionHead in motion
  5. E
    98 simulated days · 2,200 staged interactions

    Governed memory + Alpha

    Memory testing spans 14 simulated weeks of changing facts, preferences, corrections, deletion and restarts. The latest weekly block passed all 129 complete-answer reviews and corresponding state checks.

    Exit gate

    Extend the original longer campaigns and independent review while preserving owner control

    Attention98 simulated days
01

Evidence before expansion

A stage advances through passing tests, not visual spectacle or calendar pressure.

02

Adapters before motors

Physical capabilities grow through bounded commands and local safety control.

03

Partners before speculative scale

Advanced platforms should be accessed through laboratories, partners, or a funded use case.